ZZ0ECL2-DAM2M-02

https://cable-harnesses.com/web/image/product.template/751/image_1920?unique=f5605a4

Replacement of the cable with Part Number: "ZZ2RG-405" in the quote, the cable with Part Number: "HF086FEP(BK)" was used
Replacement of the cable with Part Number: "415130" The quote used the cable with Part Number:: "CP2051U"
Replacement of the screen with Part Number: "BF 1/2" in the quote, the screen with Part Number: "RAY101-12.5" was used
Waiting time for material(55A0111-20-0): 4 weeks
Waiting time for material(55A0111-22-2): 6 weeks
Lead time material(RAY101-12.5): 4 weeks
Material waiting time (DR-25-1-2-0): 26 weeks
Lead time material(D38999/32F17N): 15 weeks
Waiting time for material (55A0111-16-0): 4 weeks
Work was assumed on the material provided: "TVS06RF17-EAP"
Work was assumed on the material provided: "244-00-083-P01"
Work was assumed on the material provided: "CB-HFT3/16"
Replacement of markings with Part Number: "HSID 1/8 WHD" in the quote a label from Perspectiva Solutions was used.
The cost of the tests is to be agreed upon after receiving the test procedure.
Customer part number: CAB00050

1.00 PLN 1.0 PLN 1.00 PLN

1.00 PLN

    This combination does not exist.

    Terms and Conditions
    30-day money-back guarantee
    Shipping: 2-3 Business Days